
 # PROBLEM 2.6 # 

 Solidification time for slab-shaped casting when the casting is done in a water cooled copper mould = 0.011455 hr,
 Solidification time for slab-shaped casting when the casting is done in a very thick copper mould = 0.016563 hr,
 The surface temperature of the mould = 684.364285 C 