 Values of P1 and P2 in MW   
 
    290.67857    127.11904  
 
 Increase in fuel cost due to increase in load on plant 1 in $ per hour   
 
    993.23797  
 
 Increase in fuel cost due to increase in load on plant 2 in $ per hour   
 
    871.17469  
 
 The net savings by accounting for transmission loss in scheduling the received load of 384MW in $ per hour is   
 
    122.06328  